
Mining and Resources WHS Suite
A complete safety management system framework for Western Australian mine operators, exploration companies and resource contractors.
For WA mine operators, exploration companies and resource contractors.
Bought one by one, the 72 documents sold individually would cost $5,848.
Single-business licence · Prices in AUD · Secure checkout by PayPal
What's included
73 documents in this pack.
Documents with a link can also be bought on their own.
Guides (1)
- MR-00 Getting Started and Implementation Guide
Policies (4)
- MR-POL-01 Work Health and Safety Policy
- MR-POL-02 Worker Health and Respectful Workplace Policy
- MR-POL-03 Consultation and Stop Work Policy
- MR-POL-04 Contractor and Procurement Policy
Plans and manuals (7)
- MR-MAN-01 Safety Management System Manual
- MR-PLN-01 Emergency Management Plan
- MR-PLN-02 Occupational Health and Hygiene Plan
- MR-PLN-03 Traffic and Mobile Plant Management Plan
- MR-PLN-04 Fitness for Work and Fatigue Management Plan
- MR-PLN-05 Construction Work Health and Safety Management Plan
- MR-PLN-06 Injury Management and Return to Work Plan
Principal mining hazard plans (9)
- MR-PMH-00 Principal Mining Hazard Management Plan Framework
- MR-PMH-01 Ground and Strata Instability Plan
- MR-PMH-02 Inundation and Inrush Plan
- MR-PMH-03 Shafts and Winding Systems Plan
- MR-PMH-04 Roads and Vehicle Operating Areas Plan
- MR-PMH-05 Air Quality Dust and Airborne Contaminants Plan
- MR-PMH-06 Fire and Explosion Plan
- MR-PMH-07 Gas Outbursts Plan
- MR-PMH-08 Spontaneous Combustion Plan
Procedures (24)
- MR-PRO-01 Risk Management and Critical Controls Procedure
- MR-PRO-02 Consultation and Issue Resolution Procedure
- MR-PRO-03 Incident Notification and Investigation Procedure
- MR-PRO-04 Contractor and Simultaneous Operations Procedure
- MR-PRO-05 Training and Competency Procedure
- MR-PRO-06 Management of Change Procedure
- MR-PRO-07 Document Control and Records Procedure
- MR-PRO-08 Plant Lifecycle and Maintenance Procedure
- MR-PRO-09 Hazardous Energy Isolation Procedure
- MR-PRO-10 Electrical Safety Procedure
- MR-PRO-11 Permit to Work Procedure
- MR-PRO-12 Confined Space Procedure
- MR-PRO-13 Work at Height Procedure
- MR-PRO-14 Lifting Operations Procedure
- MR-PRO-15 Excavation and Ground Disturbance Procedure
- MR-PRO-16 Hazardous Chemicals and Dangerous Goods Procedure
- MR-PRO-17 Silica and Asbestos Control Procedure
- MR-PRO-18 Hazardous Manual Tasks and Noise Procedure
- MR-PRO-19 Remote Work and Journey Management Procedure
- MR-PRO-20 Hot Work and Fire Prevention Procedure
- MR-PRO-21 Psychosocial Risk Management Procedure
- MR-PRO-22 Personal Protective and Respiratory Equipment Procedure
- MR-PRO-23 Safe Design Procurement and Commissioning Procedure
- MR-PRO-24 Inspection Audit and Management Review Procedure
Forms and registers (20)
- MR-FRM-01 Hazard Report and Risk Assessment
- MR-FRM-02 Incident Report and Investigation
- MR-FRM-03 Change Assessment and Startup Readiness
- MR-FRM-04 Contractor Interface and Mobilisation Review
- MR-FRM-05 Induction and Competency Assessment
- MR-FRM-06 Statutory Appointment and Delegation Record
- MR-FRM-07 Critical Control Verification and Failure Response
- MR-FRM-08 Permit to Work and Isolation Certificate
- MR-FRM-09 Confined Space Entry Permit
- MR-FRM-10 Hot Work Permit
- MR-FRM-11 Work at Height and Rescue Plan
- MR-FRM-12 Lift Planning and Authorisation
- MR-FRM-13 Excavation and Ground Disturbance Permit
- MR-FRM-14 Remote Work and Journey Plan
- MR-FRM-15 Emergency Exercise and Debrief
- MR-FRM-16 Consultation and Issue Resolution Record
- MR-FRM-17 Inspection and Audit Record
- MR-FRM-18 Management Review and Due Diligence Record
- MR-FRM-19 High Risk Construction Work SWMS
- MR-FRM-20 Shift Handover and Prestart Briefing
Excel registers (8)
- MR-REG-01 Product and Document Register
- MR-REG-02 Legal and Applicability Register
- MR-REG-03 Risk and Corrective Action Register
- MR-REG-04 Training and Authorisation Register
- MR-REG-05 Plant Maintenance and Isolation Register
- MR-REG-06 Chemicals and Exposure Monitoring Register
- MR-REG-07 Assurance and Management Review Register
- MR-REG-08 Permits and Notification Register
Important
A template is a starting point.
Every workplace is different. Templates must be reviewed and adapted to the specific tasks, hazards, equipment, workforce, legal obligations and client requirements of the organisation using them. They are not legal advice.
Need help?
We can customise it for you.
If a purchased template needs to be adapted, reviewed or incorporated into a broader management system, consulting support is available.